Drilling Returns 69.5m @ 2.0g/t Au, 0.3% Cu, 0.5% Pb, 0.8% Zn and 18g/t Ag at Rogozna

February 09, 2021

Drilling at Shanac delivers further high-grade mineralisation. Drillhole ZRSD20132 was designed to improve the definition of the interpreted higher-grade mineralisation at depth in the southern end of the Shanac deposit (Figure 3). The drillhole intersected significant polymetallic mineralisation (Figures 4 - 6), with an intersection of:

187.5m @ 0.9g/t Au, 0.1% Cu, 0.3% Pb, 0.4% Zn and 10g/t Ag from 382m, including:

  • 69.5m @ 2.0g/t Au, 0.3% Cu, 0.5% Pb, 0.8% Zn and 18g/t Ag (2.9g/t Au Eq) from 382m, including
  • 26.3m @ 4.0g/t Au, 0.4% Cu, 0.6% Pb, 1.7% Zn and 17g/t Ag (5.8g/t Au Eq) from 449.5m

The high-grade polymetallic mineralisation encountered in this hole remains open to the south and at depth.

Read more.

Ibaera at 121 and Mines and Money London, November 2017 MORE NEWS Outstanding Early Drilling Results from Rogozna