Drilling Returns 69.5m @ 2.0g/t Au, 0.3% Cu, 0.5% Pb, 0.8% Zn and 18g/t Ag at Rogozna

February 09, 2021

Drilling at Shanac delivers further high-grade mineralisation. Drillhole ZRSD20132 was designed to improve the definition of the interpreted higher-grade mineralisation at depth in the southern end of the Shanac deposit (Figure 3). The drillhole intersected significant polymetallic mineralisation (Figures 4 - 6), with an intersection of:

187.5m @ 0.9g/t Au, 0.1% Cu, 0.3% Pb, 0.4% Zn and 10g/t Ag from 382m, including:

  • 69.5m @ 2.0g/t Au, 0.3% Cu, 0.5% Pb, 0.8% Zn and 18g/t Ag (2.9g/t Au Eq) from 382m, including
  • 26.3m @ 4.0g/t Au, 0.4% Cu, 0.6% Pb, 1.7% Zn and 17g/t Ag (5.8g/t Au Eq) from 449.5m

The high-grade polymetallic mineralisation encountered in this hole remains open to the south and at depth.

Read more.

Hugely Successful Maiden Drilling Programme at Rogozna MORE NEWS Outstanding Early Drilling Results from Rogozna